Access by Truck, On Street, Gas, No Building Expenses, Electricity, Bulk Storage, Changing Rooms, Telephone Exchange, Drains / Sewers, No Support Columns
[# 1390363]
Access by Truck, On Street, Gas, Service Entrance, Electricity, Changing Rooms, Security, Drains / Sewers
[# 1000081]
Concierge
[# 381799]
[# 575849]
Gas, On Main Road, On Street Corner, Electricity, Bulk Storage, Access by Truck, On Street, Telephone Exchange, Changing Rooms, Heating, Drains / Sewers, Fire Network, No Support Columns
[# 462859]
[# 436710]
Gas, On Main Road, Electricity, Bulk Storage, Living Quarters, Access by Truck, On Street, No Building Expenses, Changing Rooms, Air Conditioning, Heating, Drains / Sewers, No Support Columns
- Avellaneda: Industrial Plant Built On 3 Lots Of 8.66 X 38 Each, About 15 Blocks From Cabildo Avenue Highway, Power, Industrial Gas, Truck Entrance, Several Locker Rooms For Staff And Supervisors, Di [# 198246]
Access by Truck, On Street, Gas, No Building Expenses, Electricity, Bulk Storage, Changing Rooms, Living Quarters
- Esteban Echeverria: Beltway 1 Block And 3 Km Of Motorway Richieri Site 1420 Meters In 4 Areas Of 10 X 36, 2 Sheds 8 X 20 Each, With 7-Meter Parabolic Ceiling Height With Gate For Trucks Carrying Hig [# 141792]
Access by Truck, Weigh Bridge, On Street, Gas, No Building Expenses, On Main Road, On Street Corner, Electricity, Bulk Storage, Drains / Sewers, No Support Columns
- Bernal Important Industrial Site In The West, A Full Block R4 Zone, Located On Avenida Zapiola, Gral. Alvarez, Victor And Rodriguez Peña. Owner Sells And Finances. [# 135515]
On Street, Gas, Electricity, Changing Rooms
- Operational Plan Prepared In Parallel With Parabolic Ceiling Ships, And A Transept With A Tin Roof Water, Bridge Cranes, 2,000 Kg, Concrete Floor, Container Entrance Gates With Offices, Bathrooms An [# 135101]